Project Description: |
NEWTON- TRAFFIC SIGNAL AND SAFETY IMPROVEMENTS AT INTERCHANGE 127 (NEWTON CORNER)
Proposed scope of work will include mill and overlay, traffic signal modernization, pavement markings, signage, and upgrade to the sidewalks to meet ADA compliance. The majority of proposed construction work will be limited to the Washington St / Centre Ave Rotary area as well as the I-90 Ramps.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Muazzez G Reardon |
Estimated Total Contract Cost: | $13,500,000.00 |
Estimated Total Federal Participating Construction Cost: | $14,000,000.00 |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|