Project Description: |
BOSTON- TUNNEL LIGHTING REPLACEMENT FOR I-93 (NB/SB) RAMPS (CRC 17G)
Project includes furnishing and installing new LED tunnel luminaires in the I-93 (NB/SB) Ramp Tunnels. Work includes upgrading electrical, control and structural systems associated with the new tunnel lighting system.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2023/2024 |
Project Manager: | Hema P Bhatt![]() |
Estimated Total Contract Cost: | $54,007,577.08 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | Peer Review Comments to DE (as of 08/24/2023 ) |
|
Bridges |
|
|
|