Project Description: |
BOSTON- TUNNEL LIGHTING REPLACEMENT FOR I-93 (NB/SB) RAMPS (CRC 17G)
Project includes furnishing and installing new LED tunnel luminaires in the I-93 (NB/SB) Ramp Tunnels. Work includes upgrading electrical, control and structural systems associated with the new tunnel lighting system.
|
Location: |
|
Construction Begins: | Spring 2024 |
Resident Engineer: | Le Truong |
Construction Bid Price: | $58,326,165.50 |
District: | District 6 |
|
Bridges |
|
|
|
|