| Project Description: |
BOSTON- SUMNER TUNNEL MODELING
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alwin Ramirez![]() |
| Estimated Total Contract Cost: | $36,800.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||