Project Description: |
NORWOOD- CONCRETE MEDIAN BARRIER REPLACEMENT ON ROUTE 1
The purpose of this project is to replace the existing deteriorated concrete median barrier on Route 1 between Summer Street and Morse Street.
|
Location: |
|
Construction Begins: | Winter 2019/2020 |
Resident Engineer: | Sean Darling |
Construction Bid Price: | $1,051,195.00 |
District: | District 5 |
|
Bridges |
|
|
|
|