| Project Description: |
DISTRICT 5- SYSTEMATIC BRIDGE PRESERVATION ALONG THE ROUTE 24 CORRIDOR
|
| Location: | |
| Construction Begins: | Spring 2020 |
| Resident Engineer: | Alex Lustikman![]() |
| Construction Bid Price: | $1,539,691.00 |
| District: | District 5 |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||