Project Description:
DISTRICT 6- ADA RETROFITS AT VARIOUS LOCATIONS
The work to be done under this Contract consists of furnishing all required labor, materials and equipment required for the reconstruction of pedestrian facilities located within the designated project limits as shown in the Contract Drawings at various locations within District 6. The project includes removal of hot mix asphalt and Portland cement concrete sidewalks and wheelchair ramps and installation of concrete sidewalks and wheelchair ramps, granite curb, thermoplastic crosswalks, pavement markings, utility adjustments, drainage adjustments, signing, and other incidental items included in the Contract Documents. The scope of work also includes the maintenance and protection of traffic during construction, maintenance of vehicular and pedestrian access to abutting properties, and maintenance of uninterrupted utility service. The work includes furnishing all required temporary traffic control measures and work zone security to stage the construction safely. All temporary pedestrian facilities must be compliant with the Americans with Disabilities Act and the Massachusetts Architectural Access Board 521 CMR.
Location:
Construction Begins: Spring 2023
Resident Engineer: Marc Sullivan
Construction Bid Price: $1,207,849.00
District: District 6

Contracts (3) Progress
# 115769 -- Design -- Services
Statewide - Master Service Agreement for design and review services. Final
# 121498 -- Construction Contract
Sidewalk and ADA Improvements and Related Work in 5 Municipalities at Various Locations 11% Complete
# 77866 -- Design -- Hwy Eng Open End
Master Service Agreement for statewide design and review services. Final

Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/25/2023
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/08/2019
    Project Need Form PNF Approved 03/08/2019
    Project Initiation Form PIF Entered 03/08/2019
    Project Initiation Form PIF Approved 03/08/2019
    Project Initiation Form PRC Submitted 03/11/2019
    Project Review Committee PRC Approved 03/13/2019
    Project Status Advertised 02/25/2023
    Project Management
    100% Design 100% Package Received 03/02/2022
    100% Design 100% Package Comments to DE 04/08/2022
    25% Design 25% Package Received 05/13/2021
    25% Design 25% Package Received 05/13/2021
    75% Design 75% Package Received 05/13/2021
    75% Design 75% Package Comments to DE 06/29/2021
    Final Design PS&E Received 01/12/2023
    Final Design PS&E to FAPRO 02/21/2023