| Project Description: |
WENHAM- SAFETY IMPROVEMENTS ON ROUTE 1A
The project will include a redesign of the existing roadway by installing signage designated turning lanes at key locations and two fully signalized intersections This project will also include improvements to the existing sidewalks, the installation of new sidewalks and the redesign and relocation of existing pedestrian crosswalks.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Construction Begins: | Autumn 2026 |
| Project Manager: | Dongke Yu![]() |
| Estimated Total Contract Cost: | $4,539,918.50 |
| Estimated Total Federal Participating Construction Cost: | $4,941,812.00 |
| Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 4 |
| Current Status: | 75% Package Received (as of 02/08/2024 ) |
|