Project Description: |
ADAMS- CHESHIRE- PAVEMENT PRESERVATION AND RELATED WORK ON ROUTE 8
This 7.5-mile State Highway project will consist of resurfacing and related work on Route 8 from Mile Marker 47.55 (Lanesborough/Cheshire town line) to Mile Marker 55.02 (about 0.7-mi north of the Cheshire/Adams town line). Project will include incidental work/upgrades on secondary assets (drainage infrastructure, guard rail, signage, etc.) as needed to comply with current design and safety requirements.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2027/2028 |
Project Manager: | Koby J Lemrise![]() |
Estimated Total Contract Cost: | $13,503,180.00 |
Estimated Total Federal Participating Construction Cost: | $13,871,812.50 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization. |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|