Project Description:
RANDOLPH- RESURFACING AND RELATED WORK ON ROUTE 28
This project consists of maintenance resurfacing and roadway repairs in Randolph on Route 28 within District 6. The resurfacing project begins north of the Avon/Randolph town line, and ends approximately 300 feet South of the Route 28/Route 139 intersection. The project length is an approximate distance of 1.76 miles. The work to be done includes pavement milling and the placement of Superpave hot mix asphalt, as directed along Route 28. Other work to be done includes upgrading pedestrian ramps, installing crosswalks, adjusting drainage frames and grates/covers, updating signs and pavement markings, other miscellaneous work.
Location:
  • Town of Randolph
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2026
    Project Manager: Koby J Lemrise
    Estimated Total Contract Cost: $5,885,571.60
    Estimated Total Federal Participating Construction Cost: $6,006,174.40
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: 100% Package Received (as of 09/15/2025 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: RANDOLPH
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Hwy Perform. Prgm (NHPP) - NHS
    Federal Cost: $5,057,052.00
    State Cost: $1,264,263.00
    Total Cost: $6,321,315.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/11/2019
    Project Need Form PNF Approved 03/11/2019
    Project Initiation Form PIF Entered 03/11/2019
    Project Initiation Form PIF Approved 03/11/2019
    Project Initiation Form PRC Submitted 03/11/2019
    Project Review Committee PRC Approved 03/22/2019
    Project Management
    100% Design 100% Package Received 09/15/2025
    25% Design 25% Package Received 02/24/2025
    25% Design 25% Package Comments to DE 03/27/2025
    75% Design 75% Package Received 09/15/2025