| Project Description: |
PLYMPTON- BRIDGE REPLACEMENT, P-14-001 (445), WINNETUXET ROAD OVER WINNETUXET RIVER
The intent of the design is to match existing dimensions, and to replace the bridge in-kind with a timber bridge. Widening the bridge and roadway or deviating significantly from existing conditions would result in impacts to wetlands and water, permitting requirements, ROW, and increasing the limits and costs of work.
|
| Location: |
|
| Construction Begins: | Autumn 2024 |
| Resident Engineer: | Trevor O'Bryan![]() |
| Construction Bid Price: | $1,830,655.00 |
| District: | District 5 |
| Current Status: | Current Operations: Roadway was open for full-beneficial use on 8/22/25. Future Operations: Hand railing to be installed next week 9/29/25 -10/4/25 One day operation though TBD on exact date Normal work hours are Monday through Friday, 7:00 AM to 3:30 PM. Expect periodic lane closures and restrictions. (as of 09/29/2025) |
| Additional Info: | Winnetuxet Road is currently open to traffic. Expect one lane alternating traffic with Detain Officer when hand railing is installed. (as of 09/29/2025) |
|