HARWICH- BRIDGE PRESERVATION OF H-10-013, H-10-014 AND H-10-016 ALONG ROUTE 6
The work under this Contract consist of performing bridge structural and substructure work at Bridge H-10-013 (49V) Pleasant Lake Avenue over Route 6, Bridge H-10-014 (4A9) Route 137 Brewster-Chatham Road over Route 6, and Bridge H-10-016 (46T) Route 6 over Depot Street in Harwich.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Albin Napit![]() |
| Estimated Total Contract Cost: | $3,563,600.00 |
| Estimated Total Federal Participating Construction Cost: | $3,811,800.00 |
| Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Cape Cod Metropolitan Planning Organization. |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|