Project Description:
DISTRICT 6- ADA RETROFITS AT VARIOUS LOCATIONS
The work to be done under this Contract consists of furnishing all required labor, materials and equipment required for the reconstruction of pedestrian facilities located within the designated project limits as shown in the Contract Drawings at over 60 locations in Boston, Braintree, Chelsea, Milton, Needham, Newton, Quincy, Randolph, Watertown, Wellesley, Weston and Weymouth. The project includes removal of HMA and Portland cement concrete sidewalks and wheelchair ramps and installation of concrete sidewalks and wheelchair ramps, granite curb, thermoplastic crosswalks, pavement markings, utility adjustments, drainage adjustments, signing, and other incidental items included in the Contract Documents.
Location:
Design Responsibility: Consultant
Right of Way Responsibility: MassDOT
Construction Begins: Winter 2024/2025
Project Manager: Greg Frazier
Estimated Total Contract Cost: $1,567,022.50
Estimated Total Federal Participating Construction Cost: N/A
District: District 6
Current Status: 100% Package Comments to DE (as of 11/29/2023 )

Contracts (2) Progress
# 115769 -- Design -- Services
Statewide - Master Service Agreement for design and review services. Final
# 77866 -- Design -- Hwy Eng Open End
Master Service Agreement for statewide design and review services. Final

Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/07/2019
    Project Need Form PNF Approved 03/11/2019
    Project Initiation Form PIF Entered 05/07/2019
    Project Initiation Form PIF Approved 03/21/2019
    Project Initiation Form PRC Submitted 10/09/2019
    Project Review Committee PRC Approved 10/15/2019
    Project Management
    100% Design 100% Package Received 10/15/2023
    100% Design 100% Package Comments to DE 11/29/2023
    25% Design Design Public Hearing 04/06/2023
    75% Design 75% Package Received 09/21/2022
    75% Design 75% Package Comments to DE 12/23/2022