Project Description:
OTIS- BECKET- INTERSTATE MAINTENANCE AND RELATED WORK ON I-90
Work will include milling, hot mix asphalt overlay, pavement marking, and other incidental work. Specifically, the department is proposing the following improvement: Pavement Fine Milling the entire existing roadway surface at an average cut depth of 2½”; Resurfacing the entire roadway with a 2.5” Superpave Surface Course 12.5 Polymer' (SSC-12.5-P); Milling and resurfacing turnarounds; Upgrading non-compliant drainage structures within the roadway; Installing new slotted pavement markers; Installing new recessed pavement markings; Upgrading non-compliant guardrail and end treatments as required; Installing new guardrail delineators; Placing pavement milling mulch beneath guardrail and along the edge of pavement; Loaming and seeding areas disturbed by construction operations; Cleaning, capping, or reconstructing paved waterways as required.
Location:
  • Town of Becket
  • Town of Otis
  • Construction Begins: Spring 2021
    Resident Engineer: Zahid Pervaiz
    Construction Bid Price: $9,998,422.50
    District: District 1

    Contracts (1) Progress
    # 113850 -- Construction Contract
    Resurfacing and Related Work on a Section of Interstate 90 Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/02/2021
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Western Turnpike
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/13/2019
    Project Need Form PNF Approved 05/13/2019
    Project Initiation Form PIF Entered 05/13/2019
    Project Initiation Form PIF Approved 05/13/2019
    Project Initiation Form PRC Submitted 05/13/2019
    Project Review Committee PRC Approved 05/17/2019
    Project Status Advertised 01/16/2021
    Project Management
    25% Design 25% Package Received 08/27/2020
    25% Design 25% Package Received 08/30/2020
    75% Design 75% Package Received 08/27/2020
    Final Design PS&E Received 10/20/2020
    Final Design PS&E to FAPRO 01/05/2021