Project Description:
|
OTIS- BECKET- INTERSTATE MAINTENANCE AND RELATED WORK ON I-90
Work will include milling, hot mix asphalt overlay, pavement marking, and other incidental work. Specifically, the department is proposing the following improvement: Pavement Fine Milling the entire existing roadway surface at an average cut depth of 2½”; Resurfacing the entire roadway with a 2.5” Superpave Surface Course 12.5 Polymer' (SSC-12.5-P); Milling and resurfacing turnarounds; Upgrading non-compliant drainage structures within the roadway; Installing new slotted pavement markers; Installing new recessed pavement markings; Upgrading non-compliant guardrail and end treatments as required; Installing new guardrail delineators; Placing pavement milling mulch beneath guardrail and along the edge of pavement; Loaming and seeding areas disturbed by construction operations; Cleaning, capping, or reconstructing paved waterways as required.
|