Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
STURBRIDGE- CHARLTON- OXFORD- AUBURN- INTERSTATE MAINTENANCE AND RELATED WORK ON I-90
This project consists of resurfacing I-90 in Sturbridge, Charlton, Oxford, and Auburn. The western limit is a pavement joint in Sturbridge (mile 78.3), located just west of the I-90 bridges over the I-90 ramps to/from I-84. The eastern limit is a pavement joint in Auburn (mile 88.3), located about 700 feet east of the Oxford/Auburn Town Line. The total length of this project is 10.0 miles. The limits of work include the mainline only and does not include any of the ramps within the project limits. The work to be done primarily consists of milling and resurfacing the existing mainline and bridge decks. Related work includes clearing; adjusting and rebuilding drainage structures; replacing damaged frames and grates/covers within the traveled way with locking frames and grates/covers; resetting granite curb, granite curb inlets, and granite edging; replacing hot mix asphalt berm; replacing existing substandard guardrail; and cleaning out drainage structures, drainage piping, and drainage outfalls.
Location:
  • Town of Auburn
  • Town of Charlton
  • Town of Oxford
  • Town of Sturbridge
  • Construction Begins: Autumn 2023
    Resident Engineer: Kwabena Kantanka
    Construction Bid Price: $33,288,892.20
    District: District 3

    Contracts (1) Progress
    # 123407 -- Construction Contract
    Interstate Maintenance and Related Work on I-90 2% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/20/2023
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Western Turnpike
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/13/2019
    Project Need Form PNF Approved 05/13/2019
    Project Initiation Form PIF Entered 05/13/2019
    Project Initiation Form PIF Approved 05/13/2019
    Project Initiation Form PRC Submitted 05/13/2019
    Project Review Committee PRC Approved 05/17/2019
    Project Status Advertised 01/28/2023
    Project Status Advertised 07/29/2023
    Project Management
    100% Design 100% Package Received 09/22/2022
    25% Design 25% Package Received 06/09/2022
    75% Design 75% Package Received 06/09/2022
    75% Design 75% Package Comments to DE 07/08/2022
    Final Design PS&E Received 09/22/2022
    Final Design PS&E Received - Resub 1 12/01/2022
    Final Design PS&E Received - Resub 2 06/27/2023