Project Description: |
SWANSEA- BRIDGE PRESERVATION ON S-35-014 (3WP)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | M. Ali Jalinous![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|