Project Description: |
ROCKLAND- PEDESTRIAN AND BICYCLE IMPROVEMENTS ON MARKET STREET (ROUTE 123)
Roadway was identified through the Pedestrian and Bicycle Plans for high potential for Walkable Trips and Everyday Biking with the aim to increase and improve for people walking, biking, and taking transit.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2025 |
Project Manager: | Kathy Dougherty |
Estimated Total Contract Cost: | $3,374,815.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | 25% Package Comments to DE (as of 11/30/2021 ) |
|
Bridges |
|
|
|