Project Description:
BOSTON- ELLIS ELEMENTARY TRAFFIC CALMING (SRTS)
The Ellis Elementary Traffic Calming Project will slow vehicle speeds and provide safer crossings on routes near Ellis Elementary and surroundings schools. Proposed interventions are focused along Walnut Avenue, Humboldt Avenue, and the intersection of Harold/Crawford/Abbotsford Street. The suite of MassDOT-funded interventions include raised crossings, raised intersections, curb extensions, and signal timing revisions. Specifically: -Walnut Avenue interventions include a raised crossing on the north side of the Ruthven Street intersection, raised intersections at Westminster Avenue and Cobden Street, and curb extensions at the Walnut Avenue/Crawford Street/Holworth Street intersection. -Humboldt Avenue interventions include curb extensions at Munroe Street, Townsend Street, Waumbeck Street, and Crawford Street intersections; and signal timing improvements at MLK Jr Boulevard, Townsend Street, Wyoming Street, Waumbeck Street, and Crawford Street intersections. -A preferred alternative for the Harold/Crawford/Abbotsford Street intersection will be determined during the concept design phase, but interventions under consideration include: a combination of operational changes (e.g. revising street directions, improving visibility, clarifying yielding, etc.) and geometric changes (curb extensions, traffic circles). In addition, supplementary traffic calming interventions will be funded and implemented by the City of Boston to compliment this MassDOT Safe Routes to School Infrastructure Grant. These interventions include mid-block speed humps on neighborhood streets connecting to Walnut Avenue and Humboldt Avenue (Hutchings Street, Homestead Street, Ruthven Street, Crawford Street, Waumbeck Street, Deckard Street, Abbotsford Street, Harold Street, Harrishof Street, and Townsend Street), crosswalk striping on Humboldt Avenue, a speed feedback sign on Humboldt Avenue in the northbound direction, and on-street bike lanes on Humboldt Avenue between Seaver Street and Walnut Avenue. Specific locations of speed humps, crosswalks, and the speed feedback sign to be determined through an ongoing City-led community process.
Location:
  • City of Boston
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Construction Begins: Spring 2026
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $2,133,142.50
    Estimated Total Federal Participating Construction Cost: $2,363,537.00
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: 100% Package Received (as of 04/03/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: BOSTON
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

  • Adj. TFPC: $2,737,728 (TAP)
  • Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $2,190,182.40
    State Cost: $547,545.60
    Total Cost: $2,737,728.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 07/30/2019
    Project Need Form PNF Approved 07/19/2019
    Project Initiation Form PIF Entered 07/30/2019
    Project Initiation Form PIF Approved 07/30/2019
    Project Initiation Form PRC Submitted 08/13/2019
    Project Review Committee PRC Approved 08/15/2019
    Project Management
    100% Design 100% Package Received 04/03/2024
    25% Design 25% Package Received 03/15/2022
    25% Design 25% Package Received - Resub 1 02/23/2023
    25% Design 25% Package Received - Resub 2 01/26/2024
    25% Design Design Public Hearing 09/27/2023
    75% Design 75% Package Received 04/03/2024