Project Description: |
ACTON- INTERSECTION IMPROVEMENTS AT ROUTE 2 AND ROUTE 27 RAMPS
The improvements include signalizing the intersection of the Route 2 EB ramp at Route 27. The work involves resurfacing with minor box widening and geometric modifications. Related work involves sidewalk construction, pavement markings and signage.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Muazzez G Reardon![]() |
Estimated Total Contract Cost: | $6,010,102.80 |
Estimated Total Federal Participating Construction Cost: | $6,689,945.60 |
District: | District 3 |
Current Status: | 25% Package Comments to DE (as of 08/22/2024 ) |
|
Bridges |
|
|
|