| Project Description: |
EASTHAMPTON- NORTHAMPTON- INSTALLATION OF A SHARED-USE PATH ALONG MOUNT TOM ROAD FROM THE MANHAN TRAIL TO ATWOOD DRIVE
The purpose of this project is to construct a new shared use path on the west side of Mount Tom Road from the parking lot of the Manhan Trail in Easthampton, north 1.1 miles to Atwood Drive in Northampton.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Summer 2026 |
| Project Manager: | Muazzez G Reardon![]() |
| Estimated Total Contract Cost: | $6,421,485.00 |
| Estimated Total Federal Participating Construction Cost: | $7,220,863.25 |
| Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
| District: | District 2 |
| Current Status: | PS&E Received - Resub 1 (as of 12/03/2025 ) |
|
Bridges
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||