Project Description: |
DARTMOUTH- CROSS ROAD CORRIDOR IMPROVEMENTS
The Town of Dartmouth intends to rehabilitate Cross Road from the Fire Station to the Autumn Glen Senior Living Center, approximately 2,400 ft. The Town intends to provide 11 foot travel lanes 5 foot shoulders and 6 foot wide sidewalks both sides to the maximum extent practicable. The Town intends to provide vertical curbing and a closed drainage system and incorporate stormwater Best Management Practices to the maximum extent practicable. The Town will evaluate turn lanes and crosswalks at the George H Potter Elementary School, North Dartmouth Library, Saint George Greek Orthodox Church and Autumn Glen Senior Living Center.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Construction Begins: | Summer 2029 |
Project Manager: | Filbert Yee |
Estimated Total Contract Cost: | $5,027,448.70 |
Estimated Total Federal Participating Construction Cost: | $5,552,798.50 |
Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | 25% Package Received (as of 02/21/2023 ) |
|
Bridges |
|
|
|