Project Description: |
MANCHESTER-BY-THE-SEA- BRIDGE REPLACEMENT, M-02-001 (8AM), CENTRAL STREET (ROUTE 127) OVER SAW MILL BROOK
The project consists mainly of bridge replacement that will also involve utility upgrades drainage upgrades and road reconstruction on 225 foot section of Central Street between 29 Central Street and Church Street intersection. Traffic signs, pavement makings, sidewalks, crosswalks, granite curb, and
drainage structures will be replaced within the limit of the project.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Harry Adolphe |
Estimated Total Contract Cost: | $4,050,000.00 |
Estimated Total Federal Participating Construction Cost: | $4,350,000.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|