Project Description: |
FALL RIVER- SYSTEMATIC BRIDGE PRESERVATION, F-02-050 (3VD), ROUTE 79 (NB) OVER ROUTE 24 (SB)
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | M. Ali Jalinous![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 02/20/2021 ) |
|
Bridges |
|
|
|