Project Description: |
FALL RIVER- SOMERSET- BRIDGE REMOVAL, F-02-001=S-16-004, BRIGHTMAN STREET BRIDGE OVER TAUNTON RIVER
Work includes the removal of the Brightman Street bridge over the Taunton River (Br# F-02-001). Work will involve the removal of the bridge structure and center piers, regrading at the bridge approaches and possible dredging of the Taunton River in the vicinity of the bridge.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Joshua Bartus |
Estimated Total Contract Cost: | $17,250,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|