| Project Description: |
FALL RIVER- SOMERSET- BRIDGE REMOVAL, F-02-001=S-16-004, BRIGHTMAN STREET BRIDGE OVER TAUNTON RIVER
Work includes the removal of the Brightman Street bridge over the Taunton River (Br# F-02-001). Work will involve the removal of the bridge structure and center piers, regrading at the bridge approaches and possible dredging of the Taunton River in the vicinity of the bridge.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Joshua Bartus![]() |
| Estimated Total Contract Cost: | $30,570,123.64 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | 75% Package Received (as of 01/16/2026 ) |
|
Bridges |
||||||||
|
|
|
|||||||||||||||||||||||||||||