Project Description: |
ADAMS- BRIDGE REPLACEMENT, A-04-038, QUALITY STREET OVER HOOSIC RIVER
The proposed design begins at the roadway's intersection with Pinnacle Drive. The intersection pavement will be rebuilt to match the existing conditions. The roadway pavement courses and base will be reconstructed and graded to match the proposed profile. The project also involves rebuilding an old temporary road alignment to allow residents access to the north side of South Willow Street by car or by foot during construction. The temporary road pavement will be excavated and replaced with loam and seed after completion of the project.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Construction Begins: | Autumn 2025 |
Project Manager: | Gautam Sen |
Estimated Total Contract Cost: | $4,096,912.11 |
Estimated Total Federal Participating Construction Cost: | $4,495,618.66 |
Funding Provision: | This project is planned to be funded through the 2025 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization. |
District: | District 1 |
Current Status: | Design Public Hearing (as of 02/08/2024 ) |
|