Project Description: |
SOMERSET- STORMWATER IMPROVEMENTS ALONG ROUTE I-195 FOR MOUNT HOPE BAY
The purpose of the project is to provide water quality improvements to Mount Hope Bay and Taunton River through Stormwater Best Management Practices (BMPs). The scope of work will include but not limited to construction swale and basins along Route 195. Additionally, there will be mill and overlay of roadway surface, drainage improvements through repair and replacement, and minimal utility relocation.
|
Location: |
|
Construction Begins: | Winter 2022/2023 |
Resident Engineer: | Nelson Borges |
Construction Bid Price: | $882,114.50 |
District: | District 5 |
|
Bridges |
|
|
|
|