Project Description:
|
DISTRICT 6- BOSTON INNER HARBOR STORMWATER IMPROVEMENTS
The purpose of the project is to provide water quality improvements to the Boston Inner Harbor through Stormwater Best Management Practices (BMPs). The scope of work will include, but not be limited to, the constructions of two BMPs along the Massachusetts Ave Connector and the Access Road off I-93 Frontage Road. The scope of work will also include, but not be limited to, milling and overlaying of roadway surface, drainage improvements through repair and replacement, and minimal utility relocation.
|