| Project Description: |
DISTRICT 5- CATCH BASIN AND DRAINAGE SYSTEM CLEANING AT VARIOUS LOCATIONS (EXCLUDING THE ISLANDS)
|
| Location: | |
| Construction Begins: | Winter 2020/2021 |
| Resident Engineer: | Tabor Freitas![]() |
| Construction Bid Price: | $712,787.22 |
| District: | District 5 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||