GREENFIELD- DOWNTOWN COMPLETE STREETS IMPROVEMENTS ON MAIN STREET (ROUTE 2A)
The limits of work are from the intersection of Main Street and Colrain Street to the intersection of Main/High/Crescent Streets. Proposed major improvements include the addition of separated bike lanes, pedestrian refuge islands, curb extensions, Rectangular Rapid Flashing Beacons, revised left turn pockets at side streets, dedicated curbside bus stops, upgrade of sidewalks and wheelchair ramps to be ADA compliant, roadway resurfacing, and geometric reconfiguration of the Main/High Street intersection as either a roundabout or modified stop controlled intersection. The proposed cross section on Main Street consists of 11ft. vehicle travel lanes, a 3ft to 4ft wide striped buffer, 5ft wide bike lanes, a 0ft to 2ft buffer,and 8ft on-street parking stalls. Bus stops which are currently signed but do not have sufficient dedicated curb space for bus maneuvers are proposed to have enlarged curb space and bus shelters.
Location:
  • Town of Greenfield
  • Design Responsibility: Municipality
    Construction Begins: Spring 2027
    Project Manager: Stephanie Upson
    Estimated Total Contract Cost: $5,400,100.00
    Estimated Total Federal Participating Construction Cost: $5,800,110.00
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Franklin Regional Council of Governments.
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2027
    Responsible MPO: Franklin Regional Council of Governments
    Location: Municipality
    Cities: GREENFIELD
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • MPO Project (TEC) Score 68/100.
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $5,196,898.40
    State Cost: $1,299,224.60
    Total Cost: $6,496,123.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/25/2020
    Project Need Form PNF Approved 12/31/1969
    Project Initiation Form PIF Entered 08/25/2020
    Project Initiation Form PIF Approved 01/01/1900
    Project Initiation Form PRC Submitted 08/28/2020
    Project Review Committee PRC Approved 09/24/2020