Project Description: |
SEEKONK- ROADWAY RESURFACING & SIDEWALK INSTALLATION ON MINK STREET (ROUTE 114A)
This purpose of this project is to provide roadway resurfacing and striping, as well as add a sidewalk on the west side of the roadway. The roadway length to be resurfaced is approximately 1,800 linear feet. Drainage improvements are also included.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gregory Mischel |
Estimated Total Contract Cost: | $1,413,900.00 |
Estimated Total Federal Participating Construction Cost: | $1,544,650.00 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|