Project Description: |
BARNSTABLE- CORRIDOR IMPROVEMENTS ON ROUTE 28 INCLUDING AIRPORT ROTARY RETROFITS
The work on this project consists of roadway reconstruction along Route 28. Additionally, the proposed project includes roundabout retrofit upgrades to the rotary including signage striping and minor geometric improvements. A shared use path is also proposed and will extend on Route 28 to Mary Dunn Way in the east and Walton Ave to the west to provide a safe multimodal connection that currently does not exist.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Greg Frazier |
Estimated Total Contract Cost: | $12,725,101.00 |
Estimated Total Federal Participating Construction Cost: | $12,897,676.05 |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|