Project Description: |
DISTRICT 5- ROADSIDE VEGETATION MANAGEMENT(SPRAYING) AT VARIOUS LOCATIONS
Work consists of roadside weed control using herbicide at barrier and guardrail at selected locations that do not affect wetlands or other environmental resources. Spray areas will be limited to 3-4 foot area at guardrail to control invasive species prior to weeds going to seed and spreading .
|
Location: | |
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Andre Breneville |
Estimated Total Contract Cost: | $310,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|