Project Description: |
FRAMINGHAM- CONSTRUCTION OF OFFICE, SALT SHEDS AND PARK AND RIDE RECONSTRUCTION ON ROUTE 9
Work consists of reconstruction of Park and Ride and relocation of Route 126 Maintenance Depot to new location with associated site work and construction of salt storage sheds, office and brine tanks. Relocation of Depot needed to install stormwater controls at existing location to address flooding on Route 9.
|
Location: |
|
Construction Begins: | Summer 2022 |
Resident Engineer: | Peter Kurt |
Construction Bid Price: | $6,735,747.60 |
District: | District 3 |
|
Bridges |
|
|
|
|