Project Description: |
BOSTON- GUIDE AND TRAFFIC SIGN REPLACEMENT ON I-90/I-93 WITHIN CENTRAL ARTERY/TUNNEL SYSTEM
This project is for the replacement of guide and traffic signs on I-93 and I-90 (MassPike) within the Central Artery/Tunnel system, including applicable signing on intersecting secondary roadways.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2026 |
Project Manager: | Stephen Timmins |
Estimated Total Contract Cost: | $2,066,000.00 |
Estimated Total Federal Participating Construction Cost: | $2,244,200.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|