Project Description:
PITTSFIELD- SUPERSTRUCTURE REPLACEMENT, P-10-002, HOLMES ROAD OVER HOUSATONIC RAILROAD
The work under this Contract shall consist of the replacement of the existing superstructure and the rehabilitation of the existing substructure of the bridge carrying Holmes Road over the Housatonic Railroad and associated approach roadway work in the City of Pittsfield. The new structure will consist of precast abutment bridge seats and backwalls on refaced existing abutments, precast approach slabs, and butted precast prestressed B48-24 box beams with a 5- inch minimum reinforced concrete topping slab. The superstructure replacement shall be carried out during a full road closure permitted to commence June 23, 2023, with through traffic routed around the site via a signed detour and the site closed to pedestrians and fully reopened to traffic and pedestrians on August 25, 2023.
Location:
  • City of Pittsfield
  • Construction Begins: Summer 2022
    Resident Engineer: Cathy Spaniol
    Construction Bid Price: $3,388,849.00
    District: District 1

    Contracts (2) Progress
    # 118723 -- Construction Contract
    Bridge Superstructure Replacement Br. No. P-10-002 (Pre-Stressed Concrete Box Beams) Holmes Road over Housatonic Railroad Completed
    # 77862 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    Contract Dates
    Notice to Proceed: 08/22/2022
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/05/2020
    Project Need Form PNF Approved 12/31/1969
    Project Initiation Form PIF Entered 11/05/2020
    Project Initiation Form PIF Approved 01/01/1900
    Project Initiation Form PRC Submitted 11/05/2020
    Project Review Committee PRC Approved 12/23/2020
    Project Status Advertised 06/25/2022
    Project Management
    100% Design 100% Package Received 02/22/2022
    100% Design 100% Package Comments to DE 03/11/2022
    25% Design 25% Package Received 11/05/2021
    25% Design 25% Package Comments to DE 12/08/2021
    25% Design Design Public Hearing 03/09/2022
    75% Design 75% Package Received 11/05/2021
    75% Design 75% Package Comments to DE 12/08/2021
    Final Design PS&E Received 04/26/2022
    Final Design PS&E to FAPRO 06/10/2022
    Consultant Contract Process Scope to DE 12/03/2020
    Consultant Contract Process NTP Issued 04/22/2021