| Project Description: |
SPRINGFIELD- INTERSECTION IMPROVEMENTS AT CAREW STREET AND DWIGHT STREET
The intent of this project is to update this intersection to be safer for all users. The expected scope of this project includes either constructing a roundabout or updating the signalized intersection. The existing condition includes a signalized intersection with two lanes on Carew Street for both its approaches, Dwight Street has three lanes. The southbound approach of Dwight Street is a one way with three lanes; a left turn only, a through lane, and a shared through right turn lane. The northbound approach of Dwight Street has one right turn lane and one left turn lane. Pedestrian facilities are available but are not ADA compliant within the project limits and no bicycle facilities are present. Traffic volume analyses right-of-way and environmental impacts will dictate the lane configurations. Pedestrian and bicycle facilities will be updated where feasible.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Construction Begins: | Spring 2030 |
| Project Manager: | Gregory Mischel![]() |
| Estimated Total Contract Cost: | $7,560,100.00 |
| Estimated Total Federal Participating Construction Cost: | $7,840,105.00 |
| Funding Provision: | This project is planned to be funded through the 2030 Transportation Improvement Program for the Pioneer Valley Metropolitan Planning Organization. |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|