Project Description: |
EAST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT HIGHLAND STREET AND NORTH BEDFORD STREET (ROUTE 18)
The project proposes to improve the existing signalized intersection by either constructing a roundabout or upgrading signal equipment and tightening curb radii/modifying intersection geometry to reduce speeds and promote safety. The feasibility of constructing multi-use paths along each leg of the intersection will be explored to accommodate bicyclists and pedestrians, subject to right-of-way, environmental, utility, grading, and constructability constraints.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2029 |
Project Manager: | Aidee Cira![]() |
Estimated Total Contract Cost: | $3,037,500.00 |
Estimated Total Federal Participating Construction Cost: | $3,500,000.00 |
Funding Provision: | This project is planned to be funded through the 2029 Transportation Improvement Program for the Old Colony Metropolitan Planning Organization. |
District: | District 5 |
Current Status: | The Notice to Proceed to begin work on the contract has been issued (as of 07/23/2024 ) |
|