| Project Description: |
CHATHAM- SIDEWALK INSTALLATION ON ROUTE 28 (OLD HARBOR ROAD), FROM BARCLIFF AVENUE TO SAIL A WAY
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Thomas Simoglou![]() |
| Estimated Total Contract Cost: | $115,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||||||||