Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
LAWRENCE- COMMUNITY DAY ARLINGTON IMPROVEMENTS (SRTS)
The project proposes the reconstruction of curb ramps driveway aprons and sidewalk to improve accessibility; upgrade crosswalks with high visibility pavement markings and warning signs; construction of sidewalk bump outs at Arlington Street/Lawrence Street and Arlington Street/Hampshire Street to reduce crossing distances, improve sight lines, and reduce vehicle speeds; replace school zone beacons to reduce speeding, and install a raised sidewalk/island along Arlington Street at the school driveway to define traffic flow and parking zones and reduce conflict between pedestrians and vehicles during school pick/up dropoff. Install a traffic signal at Arlington Street/Lawrence Street and upgrade pedestrian signals at Arlington Street/Broadway with countdown signal heads and accessible pushbuttons to improve pedestrian accessibility and safety.
Location:
  • City of Lawrence
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Construction Begins: Summer 2026
    Project Manager: Jonathan E Freeman
    Estimated Total Contract Cost: $2,998,127.85
    Estimated Total Federal Participating Construction Cost: $3,284,596.59
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Merrimack Valley Metropolitan Planning Organization.
    District: District 4
    Current Status: 75% Package Received (as of 11/07/2024 )

    Contracts (2) Progress
    # 77868 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 86787 -- Design -- Services
    Work will consist of performing the collection of electronic field survey data and the completion of AutoCAD Base Plans for highway and bridge projects throughout District 4. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2026
    Responsible MPO: Merrimack Valley Metropolitan Planning Organization
    Location: Municipality
    Cities: LAWRENCE
    Category: Advertised Projects Constr.
    Budget Section: 2B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Trans. Alternative Prgm (TAP)
    Federal Cost: $3,618,836.00
    State Cost: $904,709.00
    Total Cost: $4,523,545.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/11/2021
    Project Need Form PNF Approved 12/22/2020
    Project Initiation Form PIF Entered 01/11/2021
    Project Initiation Form PIF Approved 01/01/1900
    Project Initiation Form PRC Submitted 01/11/2021
    Project Review Committee PRC Approved 01/28/2021
    Project Management
    25% Design 25% Package Received 11/07/2024
    75% Design 75% Package Received 11/07/2024
    Consultant Contract Process NTP Issued 12/22/2021