Project Description: |
EVERETT- SOMERVILLE- MYSTIC RIVER BICYCLE AND PEDESTRIAN CROSSING
There is currently no safe or viable off-road, bicycle and pedestrian shared use connection over the
Mystic River between the Fellsway and Route 99/Alford Street. The construction of a new bridge will form a critical shared use path connection between the Northern Strand Trail, the Mystic River Greenway, the Malden River Greenway, with connections back into Boston.
|
Location: |
|
Design Responsibility: | Other |
Right of Way Responsibility: | Other |
Construction Begins: | Summer 2026 |
Project Manager: | William Henry Conroy![]() |
Estimated Total Contract Cost: | $62,291,665.90 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|