Project Description: |
EVERETT- SOMERVILLE- MYSTIC RIVER BICYCLE AND PEDESTRIAN CROSSING
There is currently no safe or viable off-road, bicycle and pedestrian shared use connection over the
Mystic River between the Fellsway and Route 99/Alford Street. The construction of a new bridge will form a critical shared use path connection between the Northern Strand Trail, the Mystic River Greenway, the Malden River Greenway, with connections back into Boston.
|
Location: |
|
Design Responsibility: | Other |
Right of Way Responsibility: | Other |
Project Manager: | William Henry Conroy |
Estimated Total Federal Participating Construction Cost: | $38,218,334.35 |
District: | District 4 |
Current Status: | 75% Package Received (as of 02/06/2023 ) |
|