| Project Description: |
FOXBOROUGH- STORMWATER RETROFIT ALONG I-95 AND I-495
The scope of the project is to redesign and/or rehabilate failing stormwater control measures (SCMs) aka Stormwater Best Management Practices.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hung Pham![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||