Project Description: |
IPSWICH- RESURFACING OF ROUTE 1A
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Koby J Lemrise |
Estimated Total Contract Cost: | $1,720,950.00 |
Estimated Total Federal Participating Construction Cost: | $1,892,263.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|