Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
STATEWIDE- ITS ROADWAY EQUIPMENT FOR HIGHWAY OPERATIONS
The purpose of this project is to install ITS roadway devices along major roadways statewide such as closed circuit television cameras, roadway weather information systems, etc.
Location:
Construction Begins: Summer 2022
Resident Engineer: Misael Sanchez
Construction Bid Price: $3,199,348.00
District: District 5
Current Status: Contractor is working on excavating and installing conduit in a concrete encased trench in Gloucester (D4). Contractor is also going around to various sites and preparing for power service connectionsScheduled work hours are Monday through Friday 7:00AM to 3:30PM. (as of 05/02/2024)

Contracts (2) Progress
# 100324 -- Design -- ITS
Work will consist of on-call technical support for evaluation, design, construction, implementation, and/or operations of ITS equipment, initiatives, and systems. Final
# 118725 -- Construction Contract
Installation of an Intelligent Transportation System (ITS) Consisting of 22 Closed Circuit Television (CCTV) Cameras and 4 Road Weather Information Systems (RWIS) along Inters 93% Complete

Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/17/2022
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Contractor is working on excavating and installing conduit in a concrete encased trench in Gloucester (D4). Contractor is also going around to various sites and preparing for power service connectionsScheduled work hours are Monday through Friday 7:00AM to 3:30PM.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/22/2021
    Project Initiation Form PIF Entered 02/22/2021
    Project Initiation Form PRC Submitted 02/22/2021
    Project Review Committee PRC Approved 06/24/2021
    Project Status Advertised 06/25/2022
    Project Management
    100% Design 100% Package Received 04/15/2022
    100% Design 100% Package Comments to DE 05/03/2022
    25% Design 25% Package Received 02/07/2022
    75% Design 75% Package Received 02/07/2022
    75% Design 75% Package Comments to DE 03/17/2022
    Final Design PS&E Received 05/20/2022
    Final Design PS&E to FAPRO 06/13/2022