BARRE- BRIDGE REPLACEMENT, B-02-004, OLD COLDBROOK ROAD OVER PRINCE RIVER
The proposed project initially consisted of replacement of the superstructure. After the initial investigations, a full bridge replacement is now being considered. The project limits extend approximately 150 feet in either direction from the ends of the current bridge. Bicycle and pedestrian facilities do not exist within this area; however, accommodations are currently being considered in the design. Options are also being investigated on routes that may be necessary for a detour during construction.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Construction Begins: | Summer 2027 |
| Project Manager: | Adam W Kiel![]() |
| Estimated Total Contract Cost: | $6,878,750.40 |
| Estimated Total Federal Participating Construction Cost: | $7,307,250.60 |
| Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Central Massachusetts Metropolitan Planning Organization. |
| District: | District 2 |
| Current Status: | 25% Package Comments to DE (as of 10/21/2025 ) |
|