Project Description:
RANDOLPH- CANTON- DEDHAM- MILTON- WESTWOOD- PAVEMENT AND BRIDGE PRESERVATION ON I-95 AND I-93
The work to be done under this Contract consists of: full width pavement micomilling and resurfacing with Ultra Thin Bonded Overlay (UTBO) on Route I-93/I-95 in the Towns of Westwood, Dedham, Canton and Milton. The roadway shall be micromilled 1 inch and paved with 1 inch of UTBO Polymer Modified -in order to prevent breaking through into the penetrated stone. However, consideration should also be given, to obtaining paving cores beneath decks and discuss increasing the milling depths in these locations, together with placement of new intermediate lift as a matter of course. Bridge approaches and departures will be reviewed and re-profiled as needed to improve rideability and to provide smooth transitions. The work also includes performance bridge repairs and maintenance work to the following bridges: I-95 NB/US1/ST128 over the Neponset River and I-95 NB/SB over I-95/US1/ST128 in Canton; I-95 NB/ST128 over AMTRAK/MBTA and I-95/ ST128 over University Ave in Dedham; Ponkapoag Trail over I-93/US1 in Milton; and, I-95 NB/I-95 SB /US1 SB over the MBTA/CSX and East Street over I-95/US1/ST 128 in Westwood.
Location:
  • Town of Canton
  • Town of Dedham
  • Town of Milton
  • Town of Randolph
  • Town of Westwood
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Construction Begins: Spring 2025
    Project Manager: Eric I Nova
    Estimated Total Contract Cost: $17,819,551.77
    Estimated Total Federal Participating Construction Cost: $18,333,730.66
    Funding Provision: This project is planned to be funded through the 2025 Transportation Improvement Program for the Boston Metropolitan Planning Organization.
    District: District 6
    Current Status: PS&E Received - Resub 1 (as of 11/15/2024 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    Planned Federal FY: 2025
    Responsible MPO: Boston Metropolitan Planning Organization
    Location: Municipality
    Cities: CANTON
    DEDHAM
    WESTWOOD
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Ntl. Hwy Perform. Prgm (NHPP) - Interstate Maintenance
    Federal Cost: $26,909,196.30
    State Cost: $2,989,910.70
    Total Cost: $29,899,107.00

    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/25/2021
    Project Need Form PNF Approved 12/31/1969
    Project Initiation Form PIF Entered 02/25/2021
    Project Initiation Form PIF Approved 01/01/1900
    Project Initiation Form PRC Submitted 02/26/2021
    Project Review Committee PRC Approved 03/26/2024
    Project Management
    100% Design 100% Package Received 10/22/2024
    100% Design 100% Package Comments to DE 11/07/2024
    25% Design 25% Package Received 08/16/2024
    25% Design 25% Package Comments to DE 09/18/2024
    75% Design 75% Package Received 08/16/2024
    75% Design 75% Package Comments to DE 09/18/2024
    Final Design PS&E Received 10/22/2024
    Final Design PS&E Received - Resub 1 11/15/2024