Project Description: |
FITCHBURG- ASHBY- RESURFACING AND RELATED WORK ON ROUTE 31
The project consists of resurfacing approximately 5.3 miles of State Route 31 from John Fitch Highway in Fitchburg to Turnpike Road in Ashby to prevent further deterioration and more extensive/expensive repairs long term. Resurfacing will take place within the existing edges of road and will include cleaning drainage structures, piping, inlets, and outlets within the State Highway Layout (SHLO).
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2027 |
Project Manager: | Adam W Kiel![]() |
Estimated Total Contract Cost: | $8,866,388.38 |
Estimated Total Federal Participating Construction Cost: | $8,934,399.13 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Montachusett Metropolitan Planning Organization. |
District: | District 3 |
Current Status: | 75% Package Received (as of 03/20/2025 ) |
|