Project Description: |
DISTRICT 5- TRAFFIC SIGNAL MASTER CONTROL AND CABINET ASSEMBLY INSTALLATION AT VARIOUS LOCATIONS
|
Location: |
|
Construction Begins: | Winter 2021/2022 |
Resident Engineer: | David Todesco |
Construction Bid Price: | $537,955.00 |
District: | District 5 |
|
Bridges |
|
|
|
|