Project Description: |
ANDOVER- BRIDGE REPLACEMENT, A-09-015, TEWKSBURY STREET OVER CSX RAILROAD
The proposed project consists of a full bridge replacement of the Tewksbury Street bridge over the CSX railroad. The proposed bridge will have one 5.5’ sidewalk and bicycle accommodation consisting of two 5’ bicycle lanes have been provided in accordance with applicable design guides.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2026 |
Project Manager: | Kristine Chestna![]() |
Estimated Total Contract Cost: | $12,681,735.25 |
Estimated Total Federal Participating Construction Cost: | $13,498,816.00 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Merrimack Valley Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | 25% Package Received - Resub 1 (as of 12/19/2024 ) |
|