Project Description:
SHARON- WALPOLE- BRIDGE PRESERVATION ALONG THE I-95 CORRIDOR
Furnishing various artisans, materials, supplies, equipment and engineering services to perform bridge substructure, joint and painting along the I-95 corridor (Sharon) in District Five
Location:
  • Town of Sharon
  • Town of Walpole
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Alyson Bedard
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • S09007 
    • S09008 
    • S09009 
    • S09010 
    • S09011 
    • S09012 
    • S09013 
    • S09014 
    • W03033 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project