Project Description:
LANESBOROUGH- BRIDGE REPLACEMENT, L-03-015, US 7 WILLIAMSTOWN ROAD OVER BRODIE MOUNTAIN BROOK
The purpose of this project consists of the full replacement of the existing bridge. The roadway improvements over the bridge being investigated propose two (2) - 12’-0” travel lanes, two (2) - 10’-0” shoulders (which consists of one (1) - 8’-0” wide bike lane with a 2’-0” buffer lane on each side of the bridge). The proposed roadway reconstruction limits will be minimized to the greatest extent practicable. Traffic will be maintained during construction via a detour utilizing the nearby Old Route 7 to maintain traffic around the site.
Location:
  • Town of Lanesborough
  • Design Responsibility: Consultant
    Project Manager: William F Brown
    Estimated Total Federal Participating Construction Cost: N/A
    Funding Provision: This project is planned to be funded through the 2027 Transportation Improvement Program for the Berkshire Metropolitan Planning Organization.
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • L03015 
    See the Milestone Details tab for additional Project information
    Planned Federal FY: 2027
    Responsible MPO: Berkshire Metropolitan Planning Organization
    Location: Municipality
    Cities: LANESBOROUGH
    Category: Advertised Projects Constr.
    Budget Section: 3B
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Next Generation Bridge GANs
    Federal Cost: $1,658,182.40
    State Cost: $414,545.60
    Total Cost: $2,072,728.00