Project Description: |
HOLDEN- BRIDGE REPLACEMENT, H-18-004, SALISBURY STREET OVER G&W RAILROAD
The purpose of this project is to replace the bridge carrying Salisbury Street over the Providence and Worcester Railroad. The project will also include roadway pavement overlay, new pavement markings, as well as bicycle and ADA compliant pedestrian curb ramps and sidewalks. A 10-foot shared use path tapers to a 5.5-foot-wide sidewalk at the bridge on the west side in accordance with all applicable design guides. A detour is being proposed during the summer months when school is out to replace the bridge.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2026 |
Project Manager: | Stephen Soma![]() |
Estimated Total Contract Cost: | $6,346,058.70 |
Estimated Total Federal Participating Construction Cost: | $6,897,435.73 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Central Massachusetts Metropolitan Planning Organization. |
District: | District 3 |
Current Status: | Design Public Hearing (as of 02/20/2025 ) |
|